Contractors on the Slough Multifuel incinerator have completed a seven-day continuous slipform pour after delivering 3,300 cubic metres of concrete for SSE and joint venture partner CIP.

Read Full Article: The Construction Index



You must be logged in to post a comment.

Name (required)

Email (required)

Website

Speak your mind