Sep
15
Solution to micro-fibre concrete topping ban
September 15, 2017 | Leave a Comment
Jablite has launched a new version of its All-in-One Thermal Floor System that is BBA-certified for use as a load-bearing beam and block floor.
Jablite has launched a new version of its All-in-One Thermal Floor System that is BBA-certified for use as a load-bearing beam and block floor.
Read Full Article: The Construction Index
You must be logged in to post a comment.